Buffer management for summer mode

Application

By the use of the ENERPIPE buffer management the heat losses are reduced up to 40 % with the summer mode. This system is supplied prefabricated and ready for connection.

Note

For the function of the whole system the decentralized buffer storages have to be equipped with an ENERPIPE control EPC11 together with the additional module EPC-PM. To ensure more functional reliability you can use the additional components as data sockets with grounding flags as well as screened cables. The data cable 4x2x0,8 can also be used for the read out technology WMZA or WMZA-Pro.

 

Centralized buffer management EP-ZPM

For the start and stop operation (summer mode) of the centralized pump in the heating network. The recharging of each of the buffer storages can be preset in accordance with the requirements of the heating network. A push bottom enables a forced charging of the connected buffer storages for forthcoming maintenance. All components for the control functions installed in the cabinet are prewired.

 

Centralized buffer management EPC-ZPM

With mixer control system in order to control the flow temperature of heating systems for one mixer with On/Off-230V and for the start and stop operation (summer mode) of the centralized pump in the heating system. The recharging of each of the buffer storages can be preset in accordance with the requirements of the heating network. A push bottom enables a forced charging of the connected buffer storages for forthcoming maintenance. All components for the control functions installed in the cabinet are prewired.

 

 

Centralized buffer requirement EPC-PM

The centralized pump is only in operation when one of the buffer storages requests heat. This function protects the pump from overheating. Additionally a heat circuit module has to be built in each EPC11-control. 


The product Buffer management for summer mode has been built in the following projects

TOP PRODUCTS